| 1 |
18804340-RU-SO |
HORMIGON ARMADO F'C=210 KG/CM2 PARA VIGU... |
22 |
Metro |
18.89 |
HORMIGON PREMEZCLADO |
| 2 |
18804339-RU-SO |
PUNTO DE LUZ TOMACORRIENTE 110V |
4 |
Punto |
7.70 |
SERVICIOS DE TENDIDO DE CABLES ELECTRICO... |
| 3 |
18804338-RU-SO |
CAJA DE BREAKERS DE 6 X 12 |
1 |
Unidad |
65.98 |
SERVICIOS DE TENDIDO DE CABLES ELECTRICO... |
| 4 |
18804337-RU-SO |
BASE DE HORMIGON PARA POSTES ORNAMENTALE... |
4 |
Unidad |
38.54 |
HORMIGON PREMEZCLADO |
| 5 |
18804336-RU-SO |
HORMIGON CICLOPEO PARA MURO |
3 |
Metro Cúbico |
155.84 |
HORMIGON PREMEZCLADO |
| 6 |
18804335-RU-SO |
EXCAVACION MANUAL |
10 |
Metro Cúbico |
13.62 |
OTROS SERVICIOS DE OBRAS DE EXCAVACION Y... |
| 7 |
18804334-RU-SO |
HORMIGON SIMPLE F'C=210 KG/CM2 PARA ESCA... |
4 |
Metro Cúbico |
218.52 |
HORMIGON PREMEZCLADO |
| 8 |
18804333-RU-SO |
HORMIGON SIMPLE DE F'C=210 KG/CM2 DE REP... |
0 |
Metro Cúbico |
149.64 |
HORMIGON PREMEZCLADO |
| 9 |
18804332-RU-SO |
CORTE DE PAVIMENTO |
22 |
Metro |
4.13 |
SERVICIOS GENERALES DE CONSTRUCCION, REF... |
| 10 |
18804331-RU-SO |
LLAVE DE PASO CORTADORA DE VOLANTE DE 1/... |
5 |
Unidad |
16.31 |
TUBERIAS DE AGUA POTABLE |
| 11 |
18804330-RU-SO |
PUNTO DE DESAGUE DE 2 PULGADAS |
5 |
Punto |
16.19 |
TUBOS DE PVC |
| 12 |
18804329-RU-SO |
PUNTO DE DESAGUE DE 4 PULGADAS |
3 |
Punto |
20.87 |
TUBOS DE PVC |
| 13 |
18804328-RU-SO |
PUNTO DE AA.PP DE 1/2 PULGADA |
9 |
Punto |
10.21 |
TUBERIAS DE AGUA POTABLE |
| 14 |
18804327-RU-SO |
TUBERIA PVC CONDUIT DE3/4 PULGADA PARALU... |
28 |
Metro |
3.60 |
TUBOS DE PVC |
| 15 |
18804326-RU-SO |
TUBERIA PVC CONDUIT DE1 1/4 PULGADA PARA... |
10 |
Metro |
7.20 |
TUBOS DE PVC |
| 16 |
18804325-RU-SO |
CAJA DE REVISION DE AA.SS DE 40X40X40 CM... |
2 |
Unidad |
86.45 |
SERVICIOS DE TENDIDO DE CABLES ELECTRICO... |
| 17 |
18804324-RU-SO |
RELLENO COMPACTADO CON MATERIAL CLASIFIC... |
25 |
Metro Cúbico |
20.80 |
RELLENOS |
| 18 |
18804323-RU-SO |
EXCAVACION MECANICA |
25 |
Metro Cúbico |
4.73 |
OTROS SERVICIOS DE OBRAS DE EXCAVACION Y... |
| 19 |
18804322-RU-SO |
LIMPIEZA Y DESBROSE |
137 |
Metro Cuadrado |
1.20 |
DESMONTE |
| 20 |
18804321-RU-SO |
CONTRAPISO HORMIGON SIMPLE F'C=210 KG/CM... |
13 |
Metro Cuadrado |
16.55 |
HORMIGON PREMEZCLADO |
| 21 |
18804320-RU-SO |
BORDILLOS CON CUNETAS |
26 |
Metro |
29.54 |
BORDILLOS HORMIGON |
| 22 |
18804319-RU-SO |
BORDILLO PARA JARDINERA 12 X 30 |
26 |
Metro |
12.70 |
BORDILLOS HORMIGON |
| 23 |
18804318-RU-SO |
TUBERIA PVC CONDUIT DE1/2 PULGADA PARALU... |
30 |
Metro |
3.04 |
TUBOS DE PVC |
| 24 |
18804317-RU-SO |
CONTRAPISO HORMIGON SIMPLE F'C=210 KG/CM... |
94 |
Metro Cuadrado |
27.20 |
HORMIGON PREMEZCLADO |
| 25 |
18804316-RU-SO |
TUBO DE PVC DESAGUE DE D=160 mm |
9 |
Metro |
16.68 |
TUBOS DE PVC |
| 26 |
18804315-RU-SO |
CAJA DE REVISION DE AA.SS Y AA.LLDE 70X7... |
4 |
Unidad |
135.77 |
SERVICIOS GENERALES DE CONSTRUCCION, REF... |
| 27 |
18804314-RU-SO |
TUBO DE PVC DESAGUE; D=50 mm |
12 |
Metro |
6.34 |
TUBOS DE PVC |
| 28 |
18804313-RU-SO |
TUBERIA PVC DE 1/2 PULGADA PARAAA.PP. |
40 |
Metro |
3.68 |
TUBERIAS DE AGUA POTABLE |
| 29 |
18804312-RU-SO |
ENLUCIDO VERTICAL Y HORIZONTAL, INCLUYE... |
233 |
Metro Cuadrado |
10.51 |
PIGMENTOS PREPARADOS, OPACIFICANTES PREP... |
| 30 |
18804311-RU-SO |
MAMPOSTERIA DE BLOQUE MASISODE 10 CM |
66 |
Metro Cuadrado |
17.53 |
SERVICIOS DE ALBANILERIA ESPECIALIZADOS... |
| 31 |
18804310-RU-SO |
TUBO DE PVC; D=110 mm PARA AA.SS Y AA.LL |
32 |
Metro |
10.43 |
TUBOS DE PVC |
| 32 |
18804309-RU-SO |
CONTRAPISO HORMIGON SIMPLE F'C=210 KG/CM... |
30 |
Metro Cuadrado |
23.15 |
HORMIGON PREMEZCLADO |
| 33 |
18804308-RU-SO |
LOSA DE HORMIGON SIMPLE. |
37 |
Metro Cuadrado |
72.70 |
SERVICIOS DE CONSTRUCCION PARA LA COLOCA... |
| 34 |
18804307-RU-SO |
SUMINISTRO E INSTALACION DE TUBERIA 200... |
26 |
Metro |
20.38 |
TUBOS DE PVC |
| 35 |
18804306-RU-SO |
SUMINISTRO E INSTALACION DE GEOTEXTILno... |
40 |
Metro Cuadrado |
8.74 |
REVESTIMIENTO IMPERMEABLE ASFALTICO |
| 36 |
18804305-RU-SO |
RELLENO CON MATERIAL DE RIPIO LAVADO DE... |
4 |
Metro Cúbico |
41.51 |
RELLENOS |
| 37 |
18804304-RU-SO |
SUMINISTRO E INSTALACION DE GEOMEMBRANA... |
40 |
Metro Cuadrado |
9.67 |
REVESTIMIENTO IMPERMEABLE ASFALTICO |
| 38 |
18804303-RU-SO |
DESALOJO DE ESCOMBROS EN VOLQUETE HASTA... |
404 |
Metro Cúbico |
4.51 |
OTROS SERVICIOS DE OBRAS DE EXCAVACION Y... |
| 39 |
18804302-RU-SO |
ACERO DE REFUERZO F`Y= 4200 kg/cm² |
6299 |
Kilogramo |
2.42 |
VARILLAS DE HIERRO PARA LA CONSTRUCCION |
| 40 |
18804301-RU-SO |
HORMIGON SIMPLE PREMEZCLADO EN VIGAS DE... |
3 |
Metro Cúbico |
231.79 |
HORMIGON PREMEZCLADO |
| 41 |
18804300-RU-SO |
HORMIGON SIMPLE PREMEZCLADO EN RIOSTRASF... |
2 |
Metro Cúbico |
210.00 |
HORMIGON PREMEZCLADO |
| 42 |
18804299-RU-SO |
HORMIGON SIMPLE PREMEZCLADO EN DADOSF'C=... |
0 |
Metro Cúbico |
214.34 |
HORMIGON PREMEZCLADO |
| 43 |
18804298-RU-SO |
HORMIGON SIMPLE PREMEZCLADO EN COLUMNASF... |
1 |
Metro Cúbico |
241.03 |
HORMIGON PREMEZCLADO |
| 44 |
18804297-RU-SO |
HORMIGON SIMPLE PREMEZCLADO EN PLINTOSF'... |
2 |
Metro Cúbico |
196.92 |
HORMIGON PREMEZCLADO |
| 45 |
18804296-RU-SO |
HORMIGON SIMPLE PARAMURO F'C=210 KG/CM2... |
30 |
Metro Cúbico |
227.15 |
HORMIGON PREMEZCLADO |
| 46 |
18804295-RU-SO |
HORMIGON SIMPLE PREMEZCLADO PARA ZAPATA... |
22 |
Metro Cúbico |
212.29 |
HORMIGON PREMEZCLADO |
| 47 |
18804294-RU-SO |
HORMIGON SIMPLE PREMEZCLADO F'C=180 KG/C... |
5 |
Metro Cúbico |
179.92 |
HORMIGON PREMEZCLADO |
| 48 |
18804293-RU-SO |
RELLENO COMPACTADO CON MATERIAL PIEDRA B... |
20 |
Metro Cúbico |
36.54 |
RELLENOS |
| 49 |
18804292-RU-SO |
RELLENO COMPACTADO CON MATERIAL CLASIFIC... |
191 |
Metro Cúbico |
20.80 |
RELLENOS |
| 50 |
18804291-RU-SO |
EXCAVACION MECANICA |
386 |
Metro Cúbico |
4.73 |
OTROS SERVICIOS DE OBRAS DE EXCAVACION Y... |
| 51 |
18804290-RU-SO |
REPLANTEO Y NIVELACION |
649 |
Metro Cuadrado |
1.06 |
NIVELACION DE EMPLAZAMIENTOS |